Prepare a short, useful visit

Bring the latest available property documents, any prior drawings, a phone or camera, a notebook and a list of household priorities. If safe and permitted, visit in daylight and allow time to walk the approach as well as the plot. Record the date, weather and who attended; these details help explain what a photograph does and does not show.

Ask the owner or site contact about access, known services, past alterations, recurring water issues and available records. Treat answers as leads to verify, not as measured facts. Do not enter unsafe, occupied or restricted areas without permission. Bring a second person if you need help recording observations.

Schematic site walk showing access, edges, levels and service observations
Schematic editorial guide; not a construction drawing.

For a new home or major alteration, the National Building Code covers a broad range of building topics, including administration, structural design, services, construction management and sustainability. It is a technical reference, not a substitute for determining which local requirements and professionals apply to a specific property.

Walk the site in a consistent order

Start outside the plot. Photograph the approach from more than one direction and note road width as an observation, nearby activity, parking or loading constraints, gates, steps and overhead obstructions. Record where visitors, materials and service vehicles might arrive, without assuming that an access route is legally available.

Walk around the boundary and take broad views, then close details of visible walls, drains, trees, poles and adjacent windows. Make a rough orientation sketch and mark where each photograph was taken. Note visible changes in level, retaining edges, low points, damp patches and places where water appears to collect. These are clues to ask about, not drainage or soil conclusions.

Inside, note existing rooms, openings, finishes and visible damage if the building is occupied. Record what you can see without dismantling or testing anything. For exact levels, boundaries, underground services, soil conditions or structural capacity, arrange the relevant survey or technical investigation.

ObserveRecordFollow up
AccessApproach photos, gate and stepsConfirm ownership and practical permissions
LevelsVisible steps, slopes, low pointsRequest a measured level survey
ServicesVisible meters, pipes, drainsVerify locations and capacity with providers
NeighboursWindows, walls, trees, activityCheck privacy, access and design implications
Existing fabricCracks, stains, openings, alterationsAsk a qualified professional to assess concerns

Separate facts, questions and preferences

After the walk, sort notes into three groups: observed, reported and unknown. “Water stain visible on the north wall” is an observation; “the room floods every monsoon” is a reported history; “the cause is a blocked drain” is a hypothesis until checked. This simple distinction prevents early sketches from treating guesses as settled facts.

Then add household priorities: rooms and activities, accessibility needs, privacy, storage, daylight preferences, work-from-home needs and spaces that can change later. Mark which choices are firm and which are open. For example, “need two quiet work areas” is more actionable than “make it modern.”

Where approval or technical questions arise, check the current authority process and documents relevant to the property. The BBMP information page describes its Building Plan Approval System and points to applicable bye-laws and zoning regulations, but its page may not establish the current route for every location or project. Confirm the responsible authority and current process for the actual site.

Send a compact handover to your design team

Share the photo folder, annotated sketch, document list and question list together. Give images simple names or numbers and mark their directions on the sketch. Include contact details for the site representative and note any access restrictions. Ask your designer what further records are needed before concept options are prepared.

A worked example: a homeowner photographs a damp mark, notes that it was seen after rain, and labels the cause “unknown.” The designer can then ask for history or a building inspection rather than placing a window or storage unit over a condition that still needs investigation.

Use the worksheet below to capture field notes in one visit. It is an organizing aid; measurements, boundary confirmation, approvals and structural or service decisions belong with the relevant qualified professionals.

Take this to your next meeting

Your site checklist

  • Record visit date, attendees and site contact.
  • Photograph the approach, each boundary and notable existing conditions.
  • Sketch orientation and mark photo viewpoints.
  • Note visible levels, low points, drains, meters and overhead constraints.
  • Separate observed facts from owner reports and unknowns.
  • Write household priorities and unresolved choices.
  • List surveys, records and professional checks still needed.

Common questions

Can I use phone photos instead of a measured survey?

Photos are useful context, but they do not establish accurate dimensions, levels, boundaries or hidden services. Arrange the relevant survey when design decisions depend on those facts.

Should I measure the plot myself?

A rough tape measurement can help orient a conversation, but label it approximate. Use a qualified surveyor for dimensions or levels that must be relied on for design, boundary or approval work.

What should I do if I see cracks or dampness?

Photograph and describe what you observed, including location and date. Avoid diagnosing the cause; ask an appropriately qualified building professional to inspect where the condition may affect safety or design.

Reading notes

Sources & further reading

Checked on the dates below. Official requirements and documents can change; confirm the version that applies to your site.